Free sample

Environmental-authority opinion (MRAe)

SAS PIPA-DC1 data centre in Blyes, France

Latest document dated 13 Aug 2026, from Mission régionale d'autorité environnementale (MRAe). Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
74
MW of generator thermal input
547
MW of IT load
130

The backup fleet in the filing

Each block is one generator set: 74 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Environmental-authority opinion (MRAe)

    Mission régionale d'autorité environnementale (MRAe). Official document

  2. Official document online at our check

    Checked every day since 9 Nov 2026.

  3. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordFR-ARA-BLYES-PIPA-DC1
Location
Blyes, France
Operator or project company
SAS PIPA-DC1
Stage
Environmental-authority opinion (MRAe)
Filing date
13 Aug 2026
IT load
130 MW
Grid connection
195 MW
Backup generators
74
Generator thermal input
547 MW
Engine makes named
Not named in the filing

Source: Mission régionale d'autorité environnementale (MRAe). Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.