Environmental permit applicationBaudouin

Virtus Holdco Limited data centre in Saunderton, United Kingdom

Latest document dated 23 Apr 2026, from Environment Agency. Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
57
MW of generator thermal input
356.2
MW of IT load
78

The backup fleet in the filing

Each block is one generator set: 57 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Environmental permit application

    Environment Agency. Official document

  2. Official document no longer online

    Found offline at our check. The figures on this page come from it.

  3. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordGB-BKM-SAUNDERTON-VIRTUS-LON15-18
Location
Saunderton (Haw Lane), United Kingdom
Operator or project company
Virtus Holdco Limited
Stage
Environmental permit application
Filing date
23 Apr 2026
IT load
78 MW
Grid connection
Not stated in the filing
Backup generators
57
Generator thermal input
356.2 MW
Engine makes named
Baudouin

Source: Environment Agency. Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.