Free sample

Environmental-authority opinion

Digital Dugny data centre in Dugny, France

Latest document dated 11 Apr 2024, from Autorité environnementale (IGEDD). Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
108
MW of generator thermal input
814

The backup fleet in the filing

Each block is one generator set: 108 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Environmental-authority opinion

    Autorité environnementale (IGEDD). Official document

  2. Official document online at our check

    Checked every day since 9 Nov 2026.

  3. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordFR-IDF-DUGNY-DIGITALREALTY-HUB
Location
Dugny, France
Operator or project company
Digital Dugny
Stage
Environmental-authority opinion
Filing date
11 Apr 2024
IT load
Not stated in the filing
Grid connection
Not stated in the filing
Backup generators
108
Generator thermal input
814 MW
Engine makes named
Not named in the filing

Source: Autorité environnementale (IGEDD). Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.