backup generators
12
MW of generator thermal input
59.3
MW of grid connection
80

The backup fleet in the filing

Each block is one generator set: 12 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Environmental-authority opinion (MRAe)

    Mission régionale d'autorité environnementale (MRAe). Official document

  2. Official document online at our check

    Checked every day since 9 Nov 2026.

  3. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordFR-PACA-MARSEILLE-INTERXION-MRS4
Location
Marseille (13015, La Calade, Grand Port Maritime), France
Operator or project company
Interxion France
Stage
Environmental-authority opinion (MRAe)
Filing date
1 Oct 2020
IT load
Not stated in the filing
Grid connection
80 MW
Backup generators
12
Generator thermal input
59.3 MW
Engine makes named
Not named in the filing

Source: Mission régionale d'autorité environnementale (MRAe). Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.