Permit variation granted
Equinix (UK) Limited data centre in London, United Kingdom
Latest document dated 21 Dec 2023, from Environment Agency. Official document
- backup generators
- 33
- MW of generator thermal input
- 199
The backup fleet in the filing
Timeline
Public documents for this project, and what our daily checks found.
- Permit variation granted
Environment Agency. Official document
- Official document online at our check
Checked every day since 9 Nov 2026.
- Licence Display windows, objection deadlines and every amendment, with page references
The record
Standby Atlas recordGB-LND-EALING-EQUINIX-POWERGATE
- Location
- London (Park Royal, 2 Powergate Business Park, Volt Avenue), United Kingdom
- Operator or project company
- Equinix (UK) Limited
- Stage
- Permit variation granted
- Filing date
- 21 Dec 2023
- IT load
- Not stated in the filing
- Grid connection
- Not stated in the filing
- Backup generators
- 33
- Generator thermal input
- 199 MW
- Engine makes named
- Not named in the filing
Source: Environment Agency. Checked on 9 November 2026.
What the licences add for this project
Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.
Other projects in United Kingdom
- 129generatorsAmazon Data Services UK Limited data centre in Didcot, United KingdomEnvironmental permit granted, 27 Jul 2026
- 89generatorsEquinix (UK) Limited data centre in Slough, United KingdomPermit variation granted, 29 Aug 2025
- 57generatorsVirtus Holdco Limited data centre in Saunderton, United KingdomEnvironmental permit application, 23 Apr 2026
- 56generatorsPDCG (Group Services) Limited data centre in London, United KingdomPermit variation granted, 20 May 2025
- 47generatorsVirtus Holdco Limited data centre in Slough, United KingdomPermit variation granted, 15 Apr 2026
- 46generatorsColt Data Centre Services UK Limited data centre in Hayes, United KingdomEnvironmental permit granted, 30 Jul 2025