Air-emissions permit application
Green Mountain AS / Green Mountain… data centre in Hamar, Norway
Latest document dated 14 Feb 2024, from NVE (Norwegian Water Resources and Energy Directorate). Official document
- backup generators
- 130
- MW of IT load
- 90
The backup fleet in the filing
Timeline
Public documents for this project, and what our daily checks found.
- Air-emissions permit application
NVE (Norwegian Water Resources and Energy Directorate). Official document
- Licence Display windows, objection deadlines and every amendment, with page references
The record
Standby Atlas recordNO-INNLANDET-HAMAR-GREENMOUNTAIN-HEGGVIN
- Location
- Hamar (Heggvin næringspark), Norway
- Operator or project company
- Green Mountain AS / Green Mountain Innlandet AS
- Stage
- Air-emissions permit application
- Filing date
- 14 Feb 2024
- IT load
- 90 MW
- Grid connection
- 110 MW
- Backup generators
- 130
- Generator thermal input
- Not stated in the filing
- Engine makes named
- Not named in the filing
Source: NVE (Norwegian Water Resources and Energy Directorate). Checked on 9 November 2026.
What the licences add for this project
Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.
Other projects in Norway
- 53generatorsPolarDC DRA AS data centre in Drangedal, NorwayPollution permit granted, 14 Sep 2026
- 46generatorsWS Computing AS data centre in Skien, NorwayGrid concession granted, 28 Jan 2026
- 46generatorsWS Computing AS data centre in Skien, NorwayPollution permit granted, 25 Aug 2025
- 40generatorsPolarDC HER AS data centre in Porsgrunn, NorwayAir-emissions permit application, 16 Jan 2026
- 12generatorsGreen Mountain AS data centre in Tinn, NorwayAir-emissions permit application, 12 Dec 2025
- 10generatorsGreen Mountain AS data centre in Stavanger, NorwayPollution permit granted, 31 Mar 2026