Air-emissions permit application
Green Mountain Undheim Investment AS data centre in Time, Norway
Latest document dated 26 Oct 2026, from Statsforvalteren. Official document
The filing states neither a generator count nor a power figure.
The backup fleet in the filing
The filing does not state how many generator sets there are.
Timeline
Public documents for this project, and what our daily checks found.
- Air-emissions permit application
Statsforvalteren. Official document
- Licence Display windows, objection deadlines and every amendment, with page references
The record
Standby Atlas recordNO-ROGALAND-TIME-GREENMOUNTAIN-UNDHEIM
- Location
- Time (Undheim), Norway
- Operator or project company
- Green Mountain Undheim Investment AS
- Stage
- Air-emissions permit application
- Filing date
- 26 Oct 2026
- IT load
- Not stated in the filing
- Grid connection
- Not stated in the filing
- Backup generators
- Not stated in the filing
- Generator thermal input
- Not stated in the filing
- Engine makes named
- Not named in the filing
Source: Statsforvalteren. Checked on 9 November 2026.
What the licences add for this project
Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.
Other projects in Norway
- 53generatorsPolarDC DRA AS data centre in Drangedal, NorwayPollution permit granted, 14 Sep 2026
- 46generatorsWS Computing AS data centre in Skien, NorwayGrid concession granted, 28 Jan 2026
- 46generatorsWS Computing AS data centre in Skien, NorwayPollution permit granted, 25 Aug 2025
- 40generatorsPolarDC HER AS data centre in Porsgrunn, NorwayAir-emissions permit application, 16 Jan 2026
- 12generatorsGreen Mountain AS data centre in Tinn, NorwayAir-emissions permit application, 12 Dec 2025
- 10generatorsGreen Mountain AS data centre in Stavanger, NorwayPollution permit granted, 31 Mar 2026