Public notice: prior and construction authorisation
Data-centre project in Aragon, Spain
Latest document dated 9 Sep 2025, from www.aragon.es. Official document
The filing states neither a generator count nor a power figure.
The backup fleet in the filing
The filing does not state how many generator sets there are.
Timeline
Public documents for this project, and what our daily checks found.
- Public notice: prior and construction authorisation
www.aragon.es. Official document
- Official document no longer online
Found offline at our check. The figures on this page come from it.
- Licence Display windows, objection deadlines and every amendment, with page references
The record
Standby Atlas recordES-AR-EBRO-CAMPUS-PIGA
- Location
- Aragon, Spain
- Operator or project company
- Not named in the filing
- Stage
- Public notice: prior and construction authorisation
- Filing date
- 9 Sep 2025
- IT load
- Not stated in the filing
- Grid connection
- Not stated in the filing
- Backup generators
- Not stated in the filing
- Generator thermal input
- Not stated in the filing
- Engine makes named
- Not named in the filing
Source: www.aragon.es. Checked on 9 November 2026.
What the licences add for this project
Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.
Other projects in Spain
- —generatorsIgnis Data Alfa, S.L. data centre in Villalbilla, SpainPublic notice: prior and construction authorisation, 6 Feb 2026
- —generatorsData Riocaya, S.L.U. data centre in Badajoz, SpainPublic notice: prior and construction authorisation, 15 Sep 2026
- —generatorsInterxion España, S.L. data centre in Madrid, SpainPublic notice: prior and construction authorisation, 12 Jan 2026
- —generatorsACS DC Infra La Puebla, S.L. data centre in La Puebla de Alfindén, SpainPublic notice: prior and construction authorisation, 22 Jul 2026