Pre-application consultation
atNorth AB data centre in Stockholm, Sweden
Latest document dated 14 Jan 2026, from Consultation file published by the operator. Official document
- backup generators
- 12
- MW of generator thermal input
- 100
The backup fleet in the filing
Timeline
Public documents for this project, and what our daily checks found.
- Pre-application consultation
Consultation file published by the operator. Official document
- Licence Display windows, objection deadlines and every amendment, with page references
The record
Standby Atlas recordSE-AB-STOCKHOLM-ATNORTH-AKALLA
- Location
- Stockholm (Akalla, Kista), Sweden
- Operator or project company
- atNorth AB
- Stage
- Pre-application consultation
- Filing date
- 14 Jan 2026
- IT load
- Not stated in the filing
- Grid connection
- Not stated in the filing
- Backup generators
- 12
- Generator thermal input
- 100 MW
- Engine makes named
- Not named in the filing
Source: Consultation file published by the operator. Checked on 9 November 2026.
What the licences add for this project
Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.
Other projects in Sweden
- 280generatorsEcoDC 2 AB (EcoDataCenter) data centre in Borlänge, SwedenEnvironmental permit granted, 12 May 2026
- 145generatorsatNorth AB data centre in Sollefteå, SwedenPre-application consultation, 16 Jun 2026
- 40generatorsEcoDC Östersund AB data centre in Östersund, SwedenEnvironmental permit granted, 23 Jun 2025
- —generatorsDigital Realty AB data centre in Stockholm, SwedenEnvironmental permit application, 26 Nov 2025
- 20generatorsSI STO 01.2 AB data centre in Upplands Väsby, SwedenEnvironmental permit granted, 11 May 2023
- 16generatorsEquinix (Sweden) AB data centre in Stockholm, SwedenEnvironmental permit granted, 8 Jun 2023