Environmental permit granted

EcoDC 2 AB (EcoDataCenter) data centre in Borlänge, Sweden

Latest document dated 12 May 2026, from Borlänge kommun. Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
280
MW of generator thermal input
2,700

The backup fleet in the filing

Each block stands for five generator sets: 280 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Environmental permit granted

    Borlänge kommun. Official document

  2. Official document online at our check

    Checked every day since 9 Nov 2026.

  3. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordSE-W-BORLANGE-ECODC-KVARNSVEDEN
Location
Borlänge (Kvarnsveden), Sweden
Operator or project company
EcoDC 2 AB (EcoDataCenter)
Stage
Environmental permit granted
Filing date
12 May 2026
IT load
Not stated in the filing
Grid connection
Not stated in the filing
Backup generators
280
Generator thermal input
2,700 MW
Engine makes named
Not named in the filing

Source: Borlänge kommun. Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.

Follow new filings

Free Atom feeds, updated with each monthly release.