Environmental permit granted

EcoDC Östersund AB data centre in Östersund, Sweden

Latest document dated 23 Jun 2025, from Mark- och miljödomstolen. Official document

Location of the project in Europe. Grey dots: other projects in the index.
backup generators
40
MW of generator thermal input
350
MW of grid connection
150

The backup fleet in the filing

Each block is one generator set: 40 in all.

Timeline

Public documents for this project, and what our daily checks found.

  1. Environmental permit granted

    Mark- och miljödomstolen. Official document

  2. Official document no longer online

    Found offline at our check. The figures on this page come from it.

  3. Licence Display windows, objection deadlines and every amendment, with page references

The record

Standby Atlas recordSE-Z-OSTERSUND-ECODC
Location
Östersund (Massaveden 4), Sweden
Operator or project company
EcoDC Östersund AB
Stage
Environmental permit granted
Filing date
23 Jun 2025
IT load
Not stated in the filing
Grid connection
150 MW
Backup generators
40
Generator thermal input
350 MW
Engine makes named
Not named in the filing

Source: Mark- och miljödomstolen. Checked on 9 November 2026.

This record as JSON

What the licences add for this project

Exact engine models, abatement, fuel storage and permitted hours in the Backup Fleet licence; the dated history of every filing; grid and on-site power; and, from February 2027, ownership graded by evidence. Or order this project as a dossier for €490.